Facebook tracking pixel
Research
Updated on
Reading time:
4
Minutes

Guarantees of Origin Prices: Public Price Signals Explained

Guarantees of Origin (GOs) are priced in euros per megawatt-hour (EUR/MWh). Each GO represents one megawatt-hour of electricity. There is no single GO price: production period, country of origin, generation device age, technology and transaction terms all influence the final price. For the certificate basics, see what a Guarantee of Origin is.

What influences the price?

Start with the production period, often called the vintage, especially when buying GOs. It tells you when the electricity was generated, not when a certificate was traded. A buyer seeking 2026 production may not accept 2025 certificates, even if they are cheaper. This is an example of a buyer requirement, not a universal matching rule.

Country of production matters as well. The AIB connects participating European registries for cross-border certificate transfers, but local issuance and cancellation rules still influence how GOs can be bought, traded and used. French solar GOs and Hungarian solar GOs are not the same product simply because their production month matches.

Technology is another variable. Wind and solar GOs can command a premium over hydro and biomass GOs, depending on the market and buyer requirements. Sustainability requirements can also narrow the eligible supply: for example, RE100 requires sustainability assurance for biomass and hydropower, although third-party certification is recommended rather than mandatory. Requirements for installation age, support status or environmental labels can narrow eligible supply further.

Record the quantity of your GOs and the delivery terms you can accept alongside the expected price. For wider context, read our guide to GO market volatility.

A public price signal is not a firm offer

A historical auction result records a past sale. An indicative price is an estimate for guidance, not a firm offer you can accept to lock in a transaction. Markets can move between the observation date, publication and the time you read a report. Neither an auction result nor an indicative estimate guarantees the price you can buy or sell at today.

A wholesale price for a large volume is not necessarily the price for a smaller corporate purchase. Production period, origin, technology, installation age and other eligibility requirements can change the product and its price. The buyer's total cost may also include cancellation services, cancellation statements and guidance on where certificates must be cancelled. Check which services and fees are included before comparing prices.

Before committing to a purchase or sale, request a firm offer for the specified certificates, volume and delivery terms. Confirm the total price, included services and fees, and the offer's expiry date, time and time zone. The agreed validity period applies to that offer; there is no universal 24-hour rule. Once it expires, request a new offer rather than assuming the same price remains available.

How should you read auction results from different dates?

Auction dates provide a timeline, but the products sold on those dates also change. The examples below compare selected results from January to September 2026. This is an editorial comparison window, not a claim that all sources end in September or that these are the latest results.

The January examples all cover electricity generated in 2025. The later selected examples cover electricity generated in 2026. The price differences therefore coincide with a change of production year, or vintage. They cannot be read as the price movement of an unchanged GO product. These observations do not establish how much of the difference is due to vintage, market conditions, volume or other factors.

We apply the same selection rule within each defined product series: retain all baskets on the first auction date, the final observation, the highest reported price and the observation immediately after it. A duplicate is shown only once. This deliberately highlights the range and a result after the high; it is not an unbiased sample of typical prices or a complete volatility history. The full internal comparison series supports the selection, but only the limited selected examples appear here.

The metrics remain distinct: a pay-as-bid weighted average for Nouvelle-Aquitaine in France, a marginal auction price for Portugal and a weighted average for Greece. Prices are expressed in euros per megawatt-hour (EUR/MWh). Do not pool the examples, infer a country premium or treat them as current quotes or a European index.

France: selected Nouvelle-Aquitaine solar baskets

Five of the ten Nouvelle-Aquitaine supported-solar baskets in the retained January–September EEX archive are shown, covering four of nine auction dates. The other five baskets are omitted, including smaller July and August reversals.

On 21 January, the September and October 2025 production baskets recorded EUR 0.18/MWh and EUR 0.22/MWh. The selected 2026 production baskets recorded EUR 1.94/MWh in May, EUR 1.45/MWh in June and EUR 1.73/MWh in September. This changes both observation date and vintage; it does not demonstrate a same-product rise, fall or recovery. The May basket is the smallest by sold volume among these five selected baskets, but not among all ten comparison baskets. These results do not establish that lower volume caused a higher price.

5 selected baskets; prices 0.18, 0.22, 1.94, 1.45, 1.73 EUR/MWh. Exact auction dates and production windows in table.

Scope: The chart shows EEX weighted-average auction prices for supported solar generation in Nouvelle-Aquitaine, one region of France, not France or Europe as a whole. Every point has a different production month. The two January markers belong to the same auction date and are displayed side by side solely for legibility, not as different dates. Marker shapes distinguish 2025 and 2026 production.

Auction date Production period Price, EUR/MWh Sold / allocated MWh Source
2026-01-21 2025-09-01 to 2025-09-30 0.18 290 640 EEX: 2026-01-21
2026-01-21 2025-10-01 to 2025-10-31 0.22 268 793 EEX: 2026-01-21
2026-05-20 2026-02-01 to 2026-02-28 1.94 155 221 EEX: 2026-05-20
2026-06-17 2026-03-01 to 2026-03-31 1.45 350 787 EEX: 2026-06-17
2026-09-16 2026-06-01 to 2026-06-30 1.73 519 580 EEX: 2026-09-16

Portugal: selected supported-solar marginal prices

Four of five solar lots in the retained January–September OMIP history are shown. Only the March lot is omitted. January's EUR 0.19/MWh covered September–November 2025 production. May's EUR 1.96/MWh covered January–March 2026, July's EUR 1.45/MWh covered March–May 2026, and September's EUR 1.65/MWh covered January–July 2026.

The September basket spans seven months and overlaps both the May and July production windows. Its difference from July is not evidence of a recovery in the price of an unchanged product. The January-to-later comparison also changes production year. The May high has the smallest sold volume among the four selected lots, but March's omitted lot is smaller still; volume alone does not explain these prices.

4 selected baskets; prices 0.19, 1.96, 1.45, 1.65 EUR/MWh. Exact auction dates and production windows in table.

Scope: These are OMIP marginal auction prices for different Portuguese supported-solar baskets, not weighted averages or current quotes. The table gives the changing, overlapping production windows and sold quantities.

Auction date Production period Price, EUR/MWh Sold / allocated MWh Source
2026-01-14 2025-09-01 to 2025-11-30 0.19 94 029 OMIP: 2026-01-14
2026-05-13 2026-01-01 to 2026-03-31 1.96 90 169 OMIP: 2026-05-13
2026-07-08 2026-03-01 to 2026-05-31 1.45 189 128 OMIP: 2026-07-08
2026-09-09 2026-01-01 to 2026-07-31 1.65 264 143 OMIP: 2026-09-09

Greece: selected photovoltaic weighted averages

Three of four photovoltaic products in the retained January–September DAPEEP result documents are shown. The March photovoltaic product is omitted, not a set of unseen monthly auctions. January's EUR 0.15/MWh covered July–September 2025 production; June's EUR 1.57/MWh covered January–March 2026; September's EUR 1.41/MWh covered April–June 2026. The January-to-later comparison changes production year as well as auction date. June and September use the same production year, but different quarters and quantities, so they are not the same product either.

The product identifiers DAPEEP-2026-01, -05 and -07 are not month numbers. Each retained result date has a photovoltaic product and a separately numbered wind product: -01/-02 in January, -03/-04 in March, -05/-06 in June and -07/-08 in September. June has the smallest allocation among the three selected photovoltaic products, but March is smaller in the full four-product comparison. These observations do not isolate a volume effect.

3 selected baskets; prices 0.15, 1.57, 1.41 EUR/MWh. Exact auction dates and production windows in table.

Scope: These DAPEEP weighted-average prices concern photovoltaic production in Greece's interconnected system, from installations commissioned after 1 January 2021. Production quarters and allocations change. Support status was not established in the audited documents and is not assumed equivalent to the French or Portuguese examples.

Auction date Production period Price, EUR/MWh Sold / allocated MWh Source
2026-01-21 2025-07-01 to 2025-09-30 0.15 1 638 801 DAPEEP: 2026-01-21
2026-06-10 2026-01-01 to 2026-03-31 1.57 918 401 DAPEEP: 2026-06-10
2026-09-09 2026-04-01 to 2026-06-30 1.41 1 428 619 DAPEEP: 2026-09-09

Source coverage for this comparison

The EEX archive was retrieved on 20 November 2026 at 08:40 UTC and contains twelve regional solar baskets in the 2026 auction series through the 18 November auction, including October and November results. Ten fall within our January–September comparison. Outside the plotted window, the same regional series reports EUR 1.69/MWh on 21 October and EUR 1.62/MWh on 18 November, both below September’s EUR 1.73/MWh; these too concern changing production baskets. The retained OMIP historical PDF and DAPEEP archive were retrieved on 14 November 2026; their inspected results end on 9 September. Their retained coverage, rather than the EEX data, bounds this comparison. This does not establish that no later Portuguese or Greek results exist. The table-source links identify the publications used, not a live feed.

Dates, vintage, volumes and the price metric must accompany any comparison. The observations do not establish the causes of price differences or all-in procurement costs.

Public auction results

France: EEX

EEX publishes French GO auction results for certificates from supported renewable energy generation. These are monthly auction results, not daily prices for the whole secondary market.

The French auction uses pay-as-bid pricing. Its published weighted average therefore does not mean every buyer paid the same price. Select the relevant production period and technology, and distinguish national results from regional results.

Portugal: OMIP

OMIP publishes GO-PT auction results for Portuguese supported generation, including each lot's technology, production period, volume sold and marginal price. Its ascending-clock auction differs from the French pay-as-bid auction. Comparing the resulting prices requires checking both the certificate basket and the price metric.

Greece: DAPEEP

DAPEEP publishes an auction-results archive with dated results documents. Consult the relevant document and product terms before using a Greek auction price in a comparison.

Other public auction source: HUPX

HUPX's GO results include country, technology and production-period detail. The exchange trades GOs from multiple countries, so the exchange's location does not establish the certificates' origin. Do not describe an average covering multiple production years as the price of one vintage.

EEX daily data is a different product

EEX also offers daily end-of-day GO futures data, including settlement prices, through its subscription data service. This is separate from its French auctions.

Futures prices reflect the market's valuation of GOs for a specified future delivery contract, not necessarily electricity generated in the maturity year. A futures observation needs a named contract and maturity. Check the contract's eligible production period rather than assuming that the maturity year is the generation year. Settlement prices and traded prices are distinct fields, so record which one you are using.

Before you compare two GO prices

Check these details:

  • Observation date and signal type: auction result, futures settlement or current bid/ask.
  • Production period and, for futures, the contract and delivery maturity.
  • Country or eligible-country basket, technology, support status and other buyer criteria.
  • Volume, delivery terms and included fees, such as brokerage commissions, registry transfer fees and platform fees.
  • The publisher's price metric, such as a weighted average or marginal auction price.
  • Whether the price is historical, indicative or a firm offer. For a firm offer, confirm its expiry date, time and time zone, and any acceptance conditions.

For a buying or selling decision, request quotes matching your requirements. A public chart provides context, not a guaranteed execution price.

Discuss price signals with Soldera

Need price signals for the GOs you buy or sell? Contact Soldera's team with the production period, generation device age, country, technology and volume you want to discuss.

Stenver Jerkku is the CEO and founder of Soldera, a platform enabling renewable energy producers to maximize revenue through automated Guarantee of Origin trading. He has a background in software engineering and startup leadership, with graduate study at the University of Tartu and TalTech. His environmental commodity experience spans founding Solid World (climate finance infrastructure) alongside founding roles at eAgronom (agri-carbon and MRV) and executive roles at Glia (unicorn company). His day-to-day work focuses on Soldera's product direction, partnerships, and developing AI systems that maximize renewable producer revenues from GOs.

Kärt Kunnus
Artwork showing hydro, solar, biomass and wind icons

Additional income is waiting